IRON HILL UK
IH

London & Surrounding Areas · Fully Insured
-
One contractor, full scope
-
Structured site management
-
London-based
-
Fully Insured
-
Clear pricing & timelines
-
Free Quote In 24-hours
Full Refurbishment
We manage the complete scope, from initial strip-out through to the final decorating and snagging. Every trade is coordinated by us in phases.

1. Preparation & Strip-Out
The work area is cleared back to a workable state before any new works begin.
This includes:
-
Removal of kitchens, bathrooms and flooring•
-
Strip-out of walls, ceilings and finishes where required
-
Waste clearance and site preparation
Result:
A clean, controlled starting point with no legacy issues affecting the build.
2. Core works (plumbing, electrical, structural where applicable)
All underlying systems and structural elements are completed before visible works begin.
This includes:
-
Plumbing and pipework installation
-
Electrical first fix and setup
-
Structural or layout and foundation adjustments where required
Result:
The property is correctly set up for installation, with all core infrastructure in place.


3. Installation (kitchens, bathrooms, plastering)
Main elements are installed once the property is fully prepared and services are in place.
This includes:
-
Kitchen installation (units and carcasses)
-
Bathroom installation (sanitary and fittings)
-
Carpentry and joinery works
-
Any relevant brickwork etc.
Result:
The space takes shape, with all major components fitted and aligned.
4. Finishing (decorating, flooring, tiling, detailing)
Final surfaces and detailing are completed to bring the project to a consistent standard.
This includes:
-
Plastering and surface preparation
-
Painting and decorating
-
Flooring installation
-
Final fittings and adjustments
Result:
A clean, consistent and fully completed finish across the property.

Suitable for
We work with homeowners, landlords and managing agents across London and surrounding areas.
01 / HOMEOWNERS
Full property upgrades
Refurbishments, kitchens and interior works delivered with a clear process and finish-focused approach.
02 / LANDLORDS
Pre-let & pre-sale improvements
Void works and full refurbishments designed to keep properties compliant, rentable and market-ready.
03 / MANAGING AGENTS
Block & multi-unit works
Planned programmes delivered with structure, reporting and Section 20 awareness across managed properties.
One contractor managing the full project
-
Single point of contact from start to completion
-
All trades coordinated and managed by us
-
Structured reporting and communication throughout
-
Fully insured abd London-based
-
Clear written scope and pricing before works begin
-
Consistent finish across all works and rooms
-
Snagging, sign-off and aftercare included
-
Section 20 complaint for leasehold and block works
IH
IRON HILL UK
Property refurbishment & renovation specialists across London and surrounding areas. Designing Dreams · Building Futures.
Project Types
Contact
Legal & General
Iron Hill Group, IHUK, IHMA and FRESHRM are trading names of Iron Hill Group Limited, registered in England and Wales at 124-128 City Road, London, EC1V 2NX, United Kingdom. Company Registration Number: 15650148.
© Iron Hill Group Limited 2024-2026

